Marine & Bridge Construction
Removal of old Hospital Bridge from Pioneer River, Mackay
6 x modular steel pontoons - road transportable (18.2m x 9.4m c 1.5m) "Slade
Point" pontoons can be added to form 8-module barge.
Construction of RORO Wharf, LGL Gold, Lihir Island, PNG.
Works included design and fabrication of “Over the Top” falsework system. Driving piles up to 45 metres in length. Dynamic Pile Testing as required.
Wharf Extensions and new Berthing Dolphins PCQ – Horn Island
Works included new fender piles for the existing wharf, construction of 2 new berthing dolphins, and installation of gangways and bracing.
Piling for Grain Wharf at Mackay for Mackay Port Authority
6 x modular steel pontoons - road transportable (18.2m x 9.4m c 1.5m) "Slade
Point" pontoons can be added to form 8-module barge.
Bridge Piling for Road Tek and Local Councils
Bridge Work - pile extraction, pile driving and bored piers
Replacement of Beacons at Southport for Queensland Transport
Barge “Slade Point” - 2-Modular Steel Pontoons – Road Transportable (12mx6.2mx1.5m) c/w hydraulic Piling Frame
Demolition of bridge at Pt. Alma for John Holland
Barge “Mackay” - with A-Frame for up to 32t lift. 8-modules can lift up to 60t
Construction of 2 Dolphins on Horn Island for Ports Corporation of Queensland
Work included: Removal of debris/rock from seabed; Supply, paint, drive and splice steel piling; On-site Welding; Denso Wrapping; Formwork, Placement of reinforcing, concreting of 2 Dolphins, Supply & Installation of Walkways, handrails etc; Extraction of existing piling; Driving of new Fender Piles; Repairs to Existing Wharf.
Installation of new Beacons and Maintenance of existing Beacons at Gladstone for Comalco Aluminium Limited
Work included: Splicing and Driving of 9 new 1200 dia Steel Beacon Piles; Supply & Installation of Navigation Aid Structures; Installation of new fittings eg clamps, ladders, platforms, daymarks, lampstand etc; where required, lattice section of beacon; Modifications of existing aid structures.
Maintenance of Jetty at Seisia (Cape York) for Qld Transport
Work included: Replacement of Fender Piles, deck units & kerb units, wale beams and handrails; Removal of fuel pipeline; Disconnection of old and supply & install of new water supply pipeline; Patch painting; Concrete repairs; and Dolphin Fender Pile repairs.
Construction of 2 Dolphins in Western Samoa for Australian Department of Defence
Work included: Design; Supply & Contouring of Rock Bank; Supply and Driving of Painted Steel Piles; Setting up of formwork for dolphins & pouring of concrete; On-site Welding; Fabrication & installation of walkways, handrails and ladders; Supply & Connection of Electricity, Plumbing & Fire Systems from shore to Dolphins; Supply and Connection of Fender System.